Denver metro service
Demolition Debris Removal Dumpster Rental in Aurora, CO
From a single-room gut to a full structure teardown, a roll-off sized to the debris and the weight it's actually carrying.
- Licensed & insured
- Same-day in Aurora
- Flat-rate pricing
- All 17 metro cities

Demolition Debris Removal across the Denver metro area
Demolition debris is its own category of hauling problem: framing lumber, drywall, plaster, old cabinetry, flooring, and roofing material all pile up fast, and a lot of it is heavier than it looks once it's broken apart. Whether it's an interior gut of a single room, a garage or shed teardown, or clearing a structure ahead of new construction — a real pattern in Aurora right now given growth pushing toward Commerce City, Brighton, and the east-metro logistics corridor near Buckley Space Force Base — the debris needs to leave the site in a container built for weight, not just volume.
One thing worth knowing before any demo starts on an older home: much of Aurora's housing stock, and a lot of the surrounding Denver-metro area, predates 1980, and homes from that era commonly used asbestos-containing materials in popcorn ceilings, vinyl floor tile and its mastic, older pipe insulation, and some siding products. Colorado regulates asbestos inspection and abatement through the Colorado Department of Public Health and Environment's Air Pollution Control Division, and a certified inspection is generally required before demolition work begins on a structure, regardless of its age or size — see CDPHE's asbestos guidance for current requirements. We're not an abatement contractor and can't advise on your specific situation, but once any asbestos-containing material has been professionally cleared or removed, we'll haul the remaining demolition debris.
See dumpster sizes for weight allowances by container, and pair a demo job with concrete and heavy debris removal when the project also includes a slab, foundation, or masonry.
At a glance
What you get with demolition debris removal
- 20, 30, and 40 yard containers for framing, drywall, and mixed demo material
- Flat pricing quoted after a two-minute call about scope
- Fast delivery to keep a demo crew or contractor on schedule
- Handles interior gut jobs, garage/shed teardowns, and full structures
- Weight allowances explained upfront — no surprise overage on pickup
- Serves Aurora, Denver, Commerce City, and the wider Denver metro
Matching the container to the material
Wood-framed demolition debris — studs, subfloor, drywall, trim, cabinetry — is bulky but comparatively light per cubic yard, which is why full structure teardowns and whole-room guts usually run on a 30 or 40 yard container: there's a lot of volume to move and the weight allowance keeps pace with it. A smaller interior demo, like stripping one bathroom or kitchen back to studs, is often a 20 yard job.
Roofing material, masonry, tile, and old plaster (as opposed to drywall) weigh noticeably more per yard than framing lumber, and if a job mixes those materials in with the lighter debris, it's worth mentioning on the call so the weight allowance is sized correctly rather than guessed at.
Asbestos and older Aurora homes
Aurora grew fast through the mid-20th century, and a real share of the housing stock in Original Aurora and the older ranch-home neighborhoods dates to before 1980. That's not a reason to avoid a remodel or teardown — it's a reason to have the structure inspected before demolition begins, which Colorado requires as a matter of course through CDPHE. Popcorn ceiling texture, certain vinyl floor tiles and the black mastic under them, pipe wrap insulation, and some older siding and roofing products are the usual suspects.
Once a certified inspector has cleared the project or a licensed abatement contractor has removed flagged material, the remaining demolition debris — framing, drywall, non-asbestos flooring, cabinetry — is exactly what a standard roll-off is built to haul. We're happy to talk through container sizing for the post-abatement debris even before the inspection is scheduled.
Suitability
Is demolition debris removal the right call?
The fastest way to get this right is to check the load against both lists before you book.
Good fits for this container
- Interior gut renovations — kitchens, bathrooms, whole rooms
- Garage, shed, deck, and outbuilding teardowns
- Full structure demolition ahead of new construction
- General contractors needing a reliable pickup schedule mid-project
- Post-abatement demolition debris once a structure has been cleared
Send these somewhere else
- Any material flagged or suspected as asbestos-containing before abatement
- Pure concrete, brick, or masonry loads — see concrete and heavy debris removal
- Paint, solvents, and other hazardous chemicals from the job site
- Loads requiring same-day CDPHE demolition permit coordination — plan ahead
- Wet, unstable, or partially collapsed structures without a safety assessment first
Sizing
Which container for demolition debris removal?
Every size below runs on this service. Match the material to the weight allowance and the volume takes care of itself.
- 20 Yard Dumpster — A single-room gut, small addition demo, or a light garage/shed teardown
- 30 Yard Dumpster — Most whole-house interior demos and mid-size structure teardowns
- 40 Yard Dumpster — Full structure demolition or a large addition/remodel generating heavy volume
| Size | Dimensions | Capacity | Weight included | Best for |
|---|---|---|---|---|
| 10 Yard Dumpster | typically about 12 ft long × 8 ft wide × 3.5 ft high | about 3-4 pickup truck loads | 1-2 tons | Bathroom remodels, garage or shed cleanouts, single-room flooring tear-outs and small yard-waste jobs. |
| 15 Yard Dumpster | typically about 16 ft long × 8 ft wide × 4 ft high | about 4-6 pickup truck loads | 2 tons | Kitchen or bath remodels, combined garage and attic cleanouts, small single-layer roof tear-offs. |
| 20 Yard Dumpster | typically about 22 ft long × 8 ft wide × 4.5 ft high | about 6-8 pickup truck loads | 2-3 tons | Whole-house flooring, average-size roof tear-offs, garage demolition, mid-size estate cleanouts. |
| 30 Yard Dumpster | typically about 22 ft long × 8 ft wide × 6 ft high | about 9-12 pickup truck loads | 3-4 tons | Whole-home renovations, large estate cleanouts, new-construction framing waste, commercial buildouts. |
| 40 Yard Dumpster | typically about 22 ft long × 8 ft wide × 8 ft high | about 12-16 pickup truck loads | 4-5 tons | New-construction sites, commercial demolition, major whole-house renovations, large storm debris cleanup. |
Demolition Debris Removal — the Denver-metro specifics
Growth around the Anschutz Medical Campus, Buckley Space Force Base, and the logistics corridor stretching toward Commerce City and Brighton has kept demolition and remodel work steady across Aurora and the east Denver metro — older structures coming down to make way for new builds, and older homes getting gutted rather than replaced. Either way, the debris volume tends to be large and mixed, which is why 30 and 40 yard containers are the most commonly booked sizes for this service in the area.Talk to a real person
Need demolition debris removal in Aurora?
Call (720) 674-7563, describe the job in a sentence, and you will get a flat price and a delivery window on the same call.
Mon–Sat 7:00am – 6:00pm · Sun by appointment
Answers
Demolition Debris Removal — your questions answered
Do I need an asbestos inspection before demolition in Aurora?
Colorado generally requires a certified asbestos inspection before demolition work begins on a structure, through CDPHE's Air Pollution Control Division, regardless of the building's age or size. We can haul debris once a structure has been inspected and any flagged material addressed — see <a href="https://cdphe.colorado.gov/apcd/asbestos">CDPHE's asbestos guidance</a> for current requirements, and confirm specifics with a certified inspector.
What size dumpster do I need for a full house demolition?
Most full structure teardowns run on a 30 or 40 yard container, sometimes more than one depending on the home's size. A single-room or garage demo is usually a 20 yard. Tell us the scope on the call and we'll size it correctly.
Can you handle debris from a general contractor's ongoing project?
Yes — we work with contractors regularly and can schedule a swap-out or a second container if the project runs longer or generates more debris than expected.
What can't go in a demolition dumpster?
Asbestos-containing material that hasn't been professionally abated, paint and chemical containers, and propane tanks all need to be handled separately. Pure concrete or masonry loads are priced differently — see <a href="/services/concrete-heavy-debris.html">concrete and heavy debris removal</a>.
How fast can a demolition dumpster be delivered?
In most cases we can get a container to an Aurora or Denver-metro job site within a day or two of the call. Call (720) 674-7563 to check same-week availability.
Service area
Demolition Debris Removal across the Denver metro area
We run roll-off containers out of our 753 Salida Way yard in Aurora to all seventeen Denver-metro cities we cover — from Denver and Commerce City through Centennial and Parker, out to the eastern plains towns around Bennett and Strasburg. Aurora and the closest towns are usually same-day; the farther edges of the service area are next-day. If your town is not listed, call anyway. We likely still get there.